![]() |
|
• Home • About Fund • Partners • Contact Info • Fund's Programs | |
Community Development Support Program in the Russian Federation Based on Information and Communication Technologies (CDSP-ICT) 2011-2014
#CDSP-ICT- 17
Energy-efficient water supply control automation in Sovetskaya Gavan
Requested amount $ 14 000
Grantee and other contributions $ 1 900
Total cost $ 15 900
The city of Sovetskaya Gavan with a population of 27,202 is situated on the bank of the Gulf of Tatary. It is the capital of the Sovetsko-Gavansky Municipal district of Khabarovsk Krai.
Community problems addressed by the Project:
- Unsustainable use of the water resources of Bolshaya Khadya River.
- High power consumption in the water supply system of the city.
- Need to reduce the deterioration of key equipment by using reduced-voltage starts, eliminating water-hammer effect and reducing pressure.
- Absence of an automated control system at the water supply facilities of the city.
- Low energy-efficiency of the water production process.
- Low quality and reliability of the water supply system.
- Lack of a possibility to inform city residents online about accidents in the water supply system.
Project summary
- Installation of an automated control station for 7 wells pumps with a capacity of 32 kW each (technical controller STK500 and a set of sensors is being acquired);
- Development and installation of special software ASDKU for the upper level for servers and ARM, including visualization, data archiving and communication with facilities – control and on-line management of operating costs (electric energy);
- Analyzing water supply time dynamics; operational control and elimination of emergency situations;
- Informing consumers about technical parameter (power and water consumption at well lifting stations). Developing an information resource - Online dispatcher of the city water supply system - on the website of the city administration;
- The project is a component of the 2012-2017 Sovetskaya Gavan Utilities Infrastructure Integrated Development Program as related to the comprehensive modernization of the city’s water supply system.
Project results::
- Reduction of annual consumption of artesian water from Bolshaya Khadya River during lifting by 555,800 m³ (by 25%);
- Reduction of annual losses during water transportation to consumers by 200,000 m³ (by 9%);
- Reduction of annual power consumption by 559,124 kW (60%) or by 1.8 million rubles (by 60%);
- Reduction of equipment deterioration by 10%;
- Reduction of the cost of maintaining basic equipment by half;
- Creation of 1 new job.
- Installation of a technological equipment automated control system at Zapadny inlet station with a possibility of collecting and processing data and providing operative information to a broad range of consumers.
Contact person:
Maria Blinkova, head of Department for Investment Policy, Business Development and External Relations at Sovetskaya Gavan City Administration
Contact information:
6 Korabelnaya St., Sovetskaya Gavan, Khabarovsk Krai 682800
Tel. 8 (42138) 45-153, admsovg-invest@yandex.ruOrganization
Title
Category
Profile
City Vodokanal LLC
Business
Water collection, treatment and distribution and heat energy transportation and distribution
Duration (months)
12
Start date
1.04.2012
End date
31.03.2013